Project includes the site demolition and new site work package; the structural concrete foundations and floor slabs for the Pre-Engineered Metal Building (PEMB) not provided in Bid Release #1; the free-standing column supported and wall hung exterior canopies; the exterior masonry cavity walls along the building perimeter that were not part of the PEMB package included in Bid Release #1; exterior and interior windows; and the interior CMU, metal stud and gypsum partition walls, ceilings, room finishes, building signage, and gymnasium equipment packages for the Auxiliary Gymnasium spaces including the combination multi-court basketball and volleyball court, multi-use indoor synthetic turf practice field, large multi-purpose room, weight room, team sports instructional spaces, locker rooms, facility restroom areas and common support spaces. This project release also includes site utility work, fire protection, plumbing, HVAC duct runs and trim outs, exterior lighting, power/data/communications, security rough-ins and access control to complete the entirety of the project scope.