This design-build project consisted of (4) new packaged rooftop units with drop box drum diffusers for the addition. Customer had major water issues with RTU curbs on the existing building. Replaced all RTU curbs with new custom metal roofing curbs to resolve any water leaking issue. Also replaced all air distribution boxes on existing factory floor to resolve noise issues.